Bridge Construction Start Date: September 2013
End Date: December 2013 Description: Required to build a functional bridge made out of cardboard that could successfully support two point loads of 400 N. Was given 1 meter squared of mat board and two 30 mL tubes of glue. The bridge could not exceed 700 grams. The final bridge supported 1322 N at two point loads (the second highest in the class).
Link to GitHub Repo